1 / 25
文档名称:

最新继续教育答案 2022年继续教育培训课程(企业类).docx

格式:docx   大小:31KB   页数:25页
下载后只包含 1 个 DOCX 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

最新继续教育答案 2022年继续教育培训课程(企业类).docx

上传人:916581885 2022/7/17 文件大小:31 KB

下载得到文件列表

最新继续教育答案 2022年继续教育培训课程(企业类).docx

相关文档

文档介绍

文档介绍:several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurementween of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
关联方多
利润空间大
第二节 工程立项1
工程理想流程中的首要环节是(1分)
工程投资意向
编制工程建议书
工程评审
工程批准
第四节 工程立项3
企业必须根据实际需要,结合研发方案,提出研究工程立项申请,开展可行性研究,编制可行性研究报告。(1分)


第四节 工程立项3
对于工程工程决策失误应当进行责任追究(1分)


第五节 工程设计
工程设计业务流程最终环节是(1分)
设计合同
技术协调
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measure