文档介绍:兰州市住宅专项维修资金管理实施办法
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accuraÓᢹÜÀíºÍ¼à¶½ÊÊÓñ¾°ì·¨¡£
¡¡¡¡µÚÈýÌõסլרÏîάÐÞ×ʽðÊÇÖ¸ÒµÖ÷»ò¹²ÓÐס·¿ÊÛ·¿µ¥Î»½»´æµÄ£¬×¨ÏîÓÃÓÚסլ¹²Óò¿·Ö¡¢¹²ÓÃÉ豸ÉèÊ©±£ÐÞÆÚÂúºóµÄάÐ޺͸üС¢¸ÄÔìµÄ×ʽð¡£
¡¡¡¡±¾°ì·¨Ëù³Æסլ¹²Óò¿·Ö£¬ÊÇÖ¸¸ù¾Ý·¨ÂÉ¡¢·¨¹æºÍ·¿ÎÝÂòÂôºÏͬ£¬Óɵ¥¶°×¡Õ¬ÄÚÒµÖ÷»òÕßµ¥¶°×¡Õ¬ÄÚÒµÖ÷¼°ÓëÖ®½á¹¹ÏàÁ¬µÄ·ÇסլҵÖ÷¹²Óв¿·Ö£¬Ò»°ã°üÀ¨£º×¡Õ¬µÄ»ù´¡¡¢³ÐÖØǽÌå¡¢Öù¡¢Áº¡¢Â¥°å¡¢Îݶ¥ÒÔ¼°»§ÍâµÄÇ¡Äã¸Ò¡¢ÃÅÌü¡¢Â¥Ìݼ䡢×ßÀÈͨµÀµÈ¡£
¡¡¡¡±¾°ì·¨Ëù³Æ¹²ÓÃÉèÊ©É豸£¬ÊÇÖ¸¸ù¾Ý·¨ÂÉ¡¢·¨¹æºÍ·¿ÎÝÂòÂôºÏͬ£¬ÓÉסլҵÖ÷»òÕßסլ¼°ÓйطÇסլҵÖ÷¹²Óеĸ½Ê
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, Genera