1 / 23
文档名称:

最新歙县经济技术开发区(东区)控制性详细规划.doc

格式:doc   大小:183KB   页数:23页
下载后只包含 1 个 DOC 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

最新歙县经济技术开发区(东区)控制性详细规划.doc

上传人:916581885 2022/7/22 文件大小:183 KB

下载得到文件列表

最新歙县经济技术开发区(东区)控制性详细规划.doc

文档介绍

文档介绍:several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremenron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
 
一、规划背景
二、现状条件
三、规划范围、依据、原那么和目标
四、规划年限
五、开发条件分析
六、开发策略
七、土地使用分类和建设开发控制
八、用地布局规划
九、道路系统规划
十、绿化景观规划
十一、市政公用设施规划
 
 
 
一、规划背景
近年来,歙县的社会经济开展快速,随着徽杭高速的建设,城市及周边区域环境也发生了较大的变化。在全球经济一体化和中国参加WTO的大背景下,经济体制的转变、用地结构的调整、交通条件的根本好转等,使其经济开展逐步外向化,城市建设的面貌也日新月异。面对新世纪的机遇与挑战,同时不能破坏歙县传统的历史风貌,县城急需拓展新的开展空间。因此,歙县县人民政府拟在城东另辟新区满足日益增长的开展需求。
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal ver