1 / 4
文档名称:

英文新闻稿.doc

格式:doc   大小:13KB   页数:4页
下载后只包含 1 个 DOC 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

英文新闻稿.doc

上传人:游园会 2022/7/25 文件大小:13 KB

下载得到文件列表

英文新闻稿.doc

相关文档

文档介绍

文档介绍:英文新闻稿【3篇】
iPhone users have a reputation for being smug – and now they may have a good reason.
A recent studyded.
Business and industrial firms should enjoy real benefits and energize market activities, according to the statement.


英文新闻稿 篇三
It is barely half a century since parts of the Thames were declared ‘biologically dead’ because the river was so with the water now cleaner than at any time in living memory, entrepreneurs want to build a 10 million open-air swimming pool in the middle of the Thames in Central London.
Purification specialists from Germany – which has the highest water cleanliness standards in Europe – have designed a system which the scheme’s backers say will ensure that bathing is safe for visitors of all ages.
The Thames Baths at Temple Stairs on the Embankment will be surrounded by reed beds to filter water from the river before it is pumped into the 82ft by 32ft main lap pool, with a secondary filtration device underneath the poolside concerns have been raised about the project because of sewage overflows during heavy rain and the experience of comedian David Walliams, who suffered a bout of ‘Thames tummy’ during a 140-mile charity swim in experts from German firm Polyplan, which has built natural swimming pools all ov