文档介绍:several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremenertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured2
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured13
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
目 录
第一章 工程概况
第二章 编制依据
第三章 施工组织管理和机构设置
第四章 施工部署及施工总平面布置
第五章 施工总进度方案
第六章 主要施工机械及劳动力安排
第七章 施工测量
第八章 主要分部工程施工方法
第九章 工程拟做的试验、检验
第十章 确保工程质量的技术组织措施
第十一章 “四新技术〞的推广应用
第十二章 季节性施工措施
第十三章 确保平安生产的技术组织措施
第十四章 确保工期的技术组织措施
第十五章 确保文明施工的技术组织措施
第十六章 成品保护措施
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal v