文档介绍:STANDARD OPERATING PROCEDURES
SOP-CT-00 CONTRACT
Contents
SOP-CT-01 Taking –off of Quantities
SOP-CT-02 Calling and Awarding of Sub-Contracts
PARK HYATT SAIGON HOTEL PROJECT
STANDARD OPERATION PROCEDURE NO :
SOP-CT- 01 ( Page 1/1 )
WORK TITLE :
Taking –OFF of Quantity
APPROVED BY :
Head, Control Dept
CHECKED BY :
PROJECT MANAGER
REVISION : A
EFFECTIVE DATA :
WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIA
NA
REFERENCE STANDARDS/ CODES & QUALITY PLAN :
NA
FACILITIES /INSPECTION INSTRUMENT :
NA
ENVIRNMENT CONTROLS :
NA
NECESSARY RECORDS :
\ntractual /tender documents
2. Construction drawings
3. Taking –off formats ( Appendix 1 ( a) and 1 ( b ) )
FREQUENCY :
During planning stage and mencement of project
SPECIAL REQUIREMENTS :
SAFETY & HEALTH REQUIREMENTS
Safety Orientation Course for workers
WORK PROCEDURE
CHECKING METHOD
REMEDIAL MEASURE
RESPONSIBILITY
Project Manager
Engineer
Foreman
Assistant Foreman
Trade Worker
Checker
Subcon
Quantity Surveyor
1. Senior Quantity Surveyor /Quantity Surveyor is to extract quantities from contractual /tender documents for basic materials such as reinforcement, ready –mixed concrete, brick , etc
2..Take off quantities from construction drawings using the formats attached ( Appendix 1 (a) and 1 (b ) or similar formats
title , month/date of taking off done must be filled up in Appendix 1 (a ) and 1 ( b)
4. Total up the quantities by page
5. Summaries the quantities by using the pink formats attached ( Appendix 2 (a) and 2 (b ) or similar formats
Verify against contractual /tender documents
Construction drawings and see also Appendix 1 (a) and 1 (b) attached
NA
NA
See Appendix 2 (a) and 2 (b) attached
NA
NA
NA
NA
NA
P
P
P
P
P
File : CT -01 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK
PARK HYATT SAIGON HOTEL PROJECT
STANDARD OPERATION PROCEDURE NO :
SOP-CT- 02 ( Page 1/2 )
WORK TITLE :
Calling and