文档介绍:PYRAMID CONSTRUCTION ENGINEERING ( PTE ) LTD
QUALITY PROCEDURE
DOC. NO. : PCE-QP-PJT-06
REV. : B
SHEET : 1 OF 3
EFFECTIVE DATE – 18/01/99
TITLE: INSPECTION & TEST STATUS
Rev. #
Description of Change
Clause #
A
B
Initial Release
Insert “Piling” under Works in “Typical” Inspection & Test Status” Control
.
Attachment
Prepared By
Document Controller
(Signature) (Designation) (Date)
Reviewed By
Manager, Construction Dept
(Signature) (Designation) (Date)
Approved By
Management Representative
(Signature) (Designation) (Date)
PYRAMID CONSTRUCTION ENGINEERING ( PTE ) LTD
QUALITY PROCEDURE
DOC. NO. : PCE-QP-PJT-06
REV. : B
SHEET : 2 OF 3
TITLE: INSPECTION & TEST STATUS
1. Purpose: To define the system for the identification of inspection and test status to ensure that only materials and works that have passed the required inspection and test are despatched or used.
2. Scope: This procedure applies to the Construction Department and to the raw materials, intermediary and final works.
3. Reference: PCE-QP-PJT-05 - Inspection and Testing
PCE-QP-PJT-07 - Non-conforming Product Control
4. Responsibility
The Construction Department shall be responsible for the proper identification of inspection and test status and ensuring that only product that has passed the required inspection and test is despatched or used.
The Inspection staff who is