文档介绍:PRODUCTION PART
APPROVAL PROCESS
(PPAP)
Production Part Approval Process (PPAP)
First Edition Issued February, 1993
Second Edition, 1st Printing, February, 1995, 2nd Printing, July, 1995
Third Edition, September, 1999
Copyright © 1993, © 1995, © 1997, © 1999
DaimlerChrysler Corporation, Ford pany, General Motors Corporation
Production Part Approval Process (PPAP)
First Edition Issued February, 1993
Second Edition, 1st Printing, February, 1995, 2nd Printing, July, 1995
Third Edition, September, 1999
Copyright © 1993, © 1995, © 1997, © 1999
DaimlerChrysler Corporation, Ford pany, General Motors Corporation
The Second Edition, 2nd Printing, July, 1995 edition is obsolete February 1, 2000
unless otherwise specified by your customer
Further copies are obtainable from AIAG at 01-248-358-3003 or
Carwin Continuous (UK) in Europe 44-1-708-861333
FOREWORD TO THE THIRD EDITION
The Production Part Approval Process (PPAP) Third Edition was issued to incorporate a number of revisions
which include:
• Use of “auditable” language and a format consistent with QS-9000 to support third party auditing;
• A reordering of the PPAP requirements aligned with the typical process flow;
• Revision of “Preliminary Process Capability Requirements”, now called “Initial Process Studies”, to
provide for the use of either Cpk or Ppk, depending on the amount and type of data available, consistent
with our Statistical Process Control reference manual;
• Clarification of when customer notification and/or submission is required;
• The prior IASG QS-9000 Sanctioned Interpretations specific to PPAP;
• A Truck OEM-Specific Instructions;
• Requirements for bulk material, including a Bulk Material-Specific Appendix;
• Tire Industry-Specific Appendix;
• An enhanced glossary of terms.
The actual changes of the previous PPAP text are minimal, and evolutionary. While the additions have
increased the size of the document, they provide greater clarification of PPA