1 / 14
文档名称:

基于太阳能发电的产业技术路线图【外文翻译】.doc

格式:doc   页数:14
下载后只包含 1 个 DOC 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

基于太阳能发电的产业技术路线图【外文翻译】.doc

上传人:问道九霄 2012/3/15 文件大小:0 KB

下载得到文件列表

基于太阳能发电的产业技术路线图【外文翻译】.doc

文档介绍

文档介绍:本科毕业论文外文翻译
外文题目: Technology Roadmap Concentrating Solar Power
出处: International Energy Agency
作者: International Energy Agency
一、外文原文
Policy framework: roadmap actions and milestones
ing economic barriers
CSP today is usually petitive in wholesale bulk electricity markets, except perhaps in isolated locations such as islands or remote grids, so in the short term its deployment depends on incentives. A number of regions, including Spain, Algeria, some Indian states, Israel and South Africa, have put in place feed-in tariffs or premium payments. Spain, for example, lets the producers choose between a tariff of EUR 270 (USD 375)/MWh, or a premium of EUR 250 (USD 348)/MWh that adds to the market price, with a minimum guaranteed revenue of EUR 250/MWh and a maximum of EUR 340 (USD 473)/MWh. This approach has proven effective, as it offers developers and banks long-term price certainty, and makes CSP one of the less risky investments in the power sector.
In the United States, the federal government recently created the Renewable Energy Grant Program, as well as a Federal Loan Guarantee Program designed to foster innovation. BrightSource became the first CSP provider to benefit from this programme, securing USD billion from the US Department of Energy in February 2010 for several projects.
In the long term, however, financing of CSP plants may e difficult if investors in panies do not supply some equity capital. Prices for capacity and energy are only guaranteed by utilities on a case-by-case basis under renewable portfolio standards (the regulations that require increased production of energy from renewable sources) and these standards are not always binding.
Financing innovation
As pointed out earlier in this roadmap, many different technical approaches to CSP have been proposed, each showing expected benefits and potential challenges. All these options have to be tested in pilot plants to reveal their benefits and constraints, so strong government