1 / 43
文档名称:

philips improment action plan.ppt

格式:ppt   大小:285KB   页数:43页
下载后只包含 1 个 PPT 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

philips improment action plan.ppt

上传人:文库旗舰店 2018/5/14 文件大小:285 KB

下载得到文件列表

philips improment action plan.ppt

相关文档

文档介绍

文档介绍:Total Quality Improvement Plan For Philips Products
Eastech Confidential Document
Objective:
Improve the existing Marketing, Manufacturing and Quality System include
design qualification for new products to meet Philips expectation.
Overview:
Significant Marketing, Design, Manufacturing and Quality System deficiencies were identified as result of feedback from Philips.
The internal management team review of the entire system system indicate that Marketing, Development, Quality and Manufacturing system’s sufficient practices are not integrated throughout all phase of the critical industrialized cycles.
Execution:
Detailed action plan will finalize & publish by 28 Oct 03.
Eastech Confidential Document
Monitor Progress Measuring Tools:
Summary of PDCA & CCR
Annually Audit yield
Monthly OQA Rating
The Total Continues Improvement Plan is covering the following functions:
Operation Management System.
Project Management System.
Corporate Quality Assurance.
Design Engineering Group.
Manufacturing and Quality Control System.
Purchasing and Material Control.
Eastech Confidential Document
Total Quality Structure for Eastech
Responsibility :
Continuous Imp. Plan Ex.
Outgoing Verification
Field Call Handling
Corp Quality Assurance (CQA)
(Maged A. Ghali- Ex. Director)
Customer
Satisfaction / CIP
(EC Teh- Mgr)
Product / Component Quality Assurance
(XJ Liu- )
Group MD / Chairman of China Factories
(KW Song)
Responsibility :
Testing & Reliability ponent Verification
Design Quality Eng. Group
(Steven Heng- Mgr)
Factory Quality Control
(NL Wong-Mgr)
Responsibility :
Ongoing Quality Activity
Supplier dev. & problem solving technique
Responsibility :
Ensure new product quality level to meet the product specification
Operation Management System
Eastech Confidential Document
Manufacturing Group
Manufacturing Group Structure
Improvement Action Plan
Eastech Confidential Document
Manufacturing Group Structure
Eastech Confidential Documen