1 / 8
文档名称:

Model test investigation on an innovative lifting system for deepwater riser installation.pdf

格式:pdf   页数:8
下载后只包含 1 个 PDF 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

Model test investigation on an innovative lifting system for deepwater riser installation.pdf

上传人:化工机械 2012/8/3 文件大小:0 KB

下载得到文件列表

Model test investigation on an innovative lifting system for deepwater riser installation.pdf

文档介绍

文档介绍:.(2010)7:547-554 547
DOI -010-0107-8
Model test investigation on an innovative
lifting system for deepwater riser installation
Mao Dongfeng1, 2, Duan Menglan2 , Wang Yi3, He Ning4, Chen Bangmin2 and
Zhang Yingjie2
1 School of Mechanical Engineering, Yangtze University, Jinzhou Hubei 434023, China
2 Offshore Oil/Gas Research Center, China University of Petroleum, Beijing 102249, China
3 Department of Naval Architecture & Ocean Engineering, Dalian University of Technology, Dalian, Liaoning 116023, China
4 Offshore Oil Engineering Co., Ltd., Tanggu, Tianjin 300452, China
© China University of Petroleum (Beijing) and Springer-Verlag Berlin Heidelberg 2010
Abstract: An S-lay crane barge, OOC 201, has been built for pipe laying in deepwater oil/
gas fi elds in the South China Sea. It is due to missioned by the end of the year 2010. A special
lifting system is developed to meet the challenge that installing deepwater risers from an S-lay barge is
diffi cult and has not been achieved. The purpose of this paper was to investigate the model test on such
an innovative system, which has to be done before fi eld application. By applying the similarity theory,
the movement of the S-lay barge is simulated through a six degrees-of-freedom motion platform, and a
truncated model riser is utilized for the model testing. The displacement and force boundar