文档介绍:关于加强电力工程投资全过程控制的思考
摘要:工程建设投资控制与管理是一个动态过程,通过对工程建设各阶段的投资控制特点分析,提出建立全过程管理的意识,以达到合理地确定和有效地控制工程造价,降低工程建设成本的目的。所谓电例规划就是确定在何时、何地建设何种类型的电源和变电设备,以取得最安全、经济的电能输送效益。当前电力改革的新形势使电网规划工作的重要性日益加强
关键词:电力工程投资全过程控制;工程造价;有效控制;动态管理
Abstract: Construction investment control and management is a dynamic process, through various stages of construction projects of investment by the proposed control, the whole process of management to rational determined and effective control of the construction cost and construction costs. So-called planning is determined in electric example when, where construction what type of power and substation equipment, in order to obtain the most safety, economy of electricity transmission efficiency. The current power reform of the new situation that grid planning the importance of work strengthened day by day
Key Words:Power engineering construction investment, the whole process control Project cost Effective control Dynamic management
一:概述
随着我国社会经济持续快速的发展和人民生活水平的不断提高,义乌市全社会的用电量不断攀升,电网建设投资力度不断加大。因而,如何把有限的资金用在刀刃上,并发挥最大的效益,对投资进行有效控制显得尤为重要。工程投资全过程控制是一种全新的建设管理模式,它强调工程建设项目是一个过程,工程造价的确定与控制也是一个过程,只有通过对工程项目建设各阶段的管理与控制,才可以控制项目投资不超过批准的造价限额,才可以合理地使用人力、物力和财力,取得最大的投资效益。强化投资管理是实现电网科学发展的基础,是防范经营风险、提高投资效益和实现企业科学发展的保障,也是落实“三节约”的重要举措。近年来,电网企业建设成本、运营成本等刚性支出急剧升高,同时受宏观经济形势等的影响,赢利空间不断减小,企业经营压力剧增。优化电网投资规模,提高投资效益显得更加重要。
在电网发展过程中,义乌市供电局认真落实***关于加强投资管理的有关要求,注重全过程管理电网项目的建设投资,开展了一系列有益的探索和尝试。