ANHUI SHAYING RIVER CHANNEL IMPROVEMENT PROJECT
ENVIRONMENT IMPACT ASSESSMENT
Executive Summary
July. 2010
TABLE OF CONTENTS
1. Introduction 1
. Background 1
. Project Development Objective 1
. Environmental Assessment Process and Legal Framework 2
. Project Description 3
2. Analysis of Alternatives 10
. Alternatives of Service Areas 10
. Alternatives of Construction Technology 11
. Alternatives of silt disposal area 11
3. Environmental Baseline 6
4. Environmental Impacts 13
. Impacts During the Construction Phase 13
. Impacts During the Operation Phase 15
. Indirect and Cumulative Impacts 18
5. Mitigation Measures 20
. Mitigation measures During the Construction Phase 20
. Mitigation measures During the Operation Phase 24
6. Environmental Management Plan 28
7. Public Participation and Information Disclosure 32
8. Conclusions 33
Introduction
Background
This document is the executive summary of the environment impact assessment (EIA) of the WB financed project Anhui Shaying River Channel Improvement Project. It summarizes the main issues and conclusions of EIA and the Environmental Management Plan (EMP) of the project. According to Chinese EIA laws and World Bank Operational Policy Environmental Assessment, the proposed project is Category A for environmental assessment purpose, due to the scale and significance of the potential environmental and social impacts, the size and nature of the project activities, and the sensitivity of the project areas. Accordingly, a full environmental assessment was conducted.
Anhui Provincial Environmental Science Institute (APESI) prepared the project EIA by then project owner Fuyang Port and Navigation Bureau (FPNB) at the project feasibility study stage. The EIA report was approved by Anhui Provincial Environmental Protection Department in 2008. Since then, the project ownership has been transferred to Anhui Provincial Port and Shipping Construction