文档介绍:Testing: Unit Testing / User Manual Module: Production Planning
ENVIRONMENT
SYSTEM : SAP R/3 ECC
CLIENT : 200
UNIT TESTING SCENARIO
SCENARIO NUMBER : PP - 11
DESCRIPTION : Work Centre
PREPARED BY
NAME : K S Muralikrishna
DATE :
TEAM : Production Planning
APPROVED & TESTED BY
NAME : Nanhe Babu (PwC)
DATE :
TEAM : Production Planning
Page 1 of 15
Testing: Unit Testing / User Manual Module: Production Planning
CONCEPT WORK CENTRE
The Work centre is a place where the single or multiple operations are done to produce the
Product. The work centre can be defined for Machine, Labour, Group of Machine and Group
Of Labour (. Man Power). This is required to define to establish the capacity of the Work Centre,
Costs incurred on the work centre and derive the product cost.
1. Transaction Code/ Path
Enter the menu path of the transaction code, which is going to be tested by the user.
Menu Path Logistics Production Master Data Work Centre CR01 - Create
CR01
2. Input Data
1. Enter the Input parameters, which need to be given by the user during the testing of this
scenario.
2. Input the value for the fields and then if required, copy the screen shot of the input screen
after the table.
3. If the scenario has multiple screen inputs, which needs to be processed, repeat the step 2
for every screen.
Input Screen Name – Create Work Centre : Initial Screen
Description of the Nature of the
Value of the Field
Field Field
Create Work Centre Mandatory
WORK CENTRE CREATION SAP ERP SYSTEM
Work Centres to be Defined in the following Procedure
Select the Create CR01
Page 2 of 15
Testing: Unit Testing / User Manual Module: Production Planning
Can also go to work centre by selecting the Transaction Code CR01 at top window as below
The below Work Centre Creation Window will appear
Page 3 of 15
Testing: Unit Testing / User Manual Module: Production Planning
Enter Plant and Name of Work Ce