文档介绍:(A)Put on before the ash, the wall noodles has to clean up clean, water moist.
(B)Big wall noodles and four sides play line to seek rules, have to be exactly
carried on at a time by the crest layer,
Flick perpendicular line open, and decide noodles brick wall size, the layering
establishes a point and does an ash a round flat  horizontal line then
takes floor as
The level radicle line hands over a turn of control, Shu to line then with on all
sides big Cape and all-powerful Duo and post for the base line control.
Each dozen what time then uses this ash a round flat cake as a basis point to
carry on blunt Jin and makes its first floor ash attain horizontal even Shu to
keep.
At the same time want to notice to seek very outstanding Yan good, the
flowing water slope of waist line, window sill, the rain Peng etc. decoration
noodles.
(C)Put on first floor sand syrup:Water the wall noodles moist first, then use
one ∶ 3 cement sand the syrup pare off together
About 6 mm thick, follow close behind useful ash from the same strength
grade to put on with the Jin hurtled even, immediately pare off with the wood
Gang even,
The wood puts on to rub hair and waters to protect next day.
(D)Play line the space is for cent:Need grass-roots ash six to 70%1000:00,
can immediately press the diagram paper to request to carry on the segment
of cent a cent
The space plays