文档介绍:目 录慨况······································1预制块护坡·································. 预制块制作 ·······························. 预制块铺设 ·······························2抛石护岸···································. 施工程序 ·································. 施工测量 ·································. 材料准备 ·································. 抛投试验 ·································. 水下护岸抛石 ·····························. 水上护岸抛石 ·····························6砌石工程···································. 浆砌石施工方法 ····························. 干砌石施工方法 ····························8植草皮····································. 草块移植铺张法施工 ·························. 播种法施工 ······························10泥灰结石路面·······························10沥青表面处治·······························13质量保证措施·······························. 原材料质量保证措施 ························. 预制混凝土质量保证措施 ·····················. 砌石、抛石质量检保证措施 ···················. 泥结石路面质量保证措施 ·····················16施工安全措施·······························. 施工现场安全措施 ·························. 用电安全措施 ····························18单元工程划分·······························19计划投入的人员及设备························. 施工人员投入计划·························. 施工设备投入计划·························20施工进度计划·······························20护坡工程施工方案慨况护坡工程包括砼预制块、抛石护岸、砌石、植草皮、泥灰结石、沥青表面处治。砼预制块包括预制块护坡、路肩石。砼预制块护坡为六角块护坡,施工桩号为36+800~41+500和43+512~44+750,六角块厚度120mm,,单块重约67kg,。混凝土预制路肩主要布置在堤顶公路、上堤路及跨堤公路。预制块为城门洞形,路肩每块长度50cm,单块混凝土量为 ,单块重约79kg,总数量3万块。,(鱼塘)。砌石工程项目包括排水渠道、 道路、排水沟等建筑物的浆砌石挡墙及浆(干)砌石护坡等。,;、;干砌石100m3;截水沟浆砌石413m3。还包括碎、;。植草皮包括堤内坡脚 ,。泥灰结石是指堤顶和防汛路泥灰结石,工程量为 11996m3。沥青表面处治是指堤顶路和防汛路表面沥青处治,工程量为2999m3。-1-. 预制块制作预制混凝土在预制场进行预制,预制场配制4台成型多用机,在预制场内人工配合手推车运输,从预制场到铺砌堤面,采用人工配合自带吊车运运输,人工铺砌。由于预制工程量大,采用四套“ JQ-2000混凝土路肩、护坡面砖液压成型多用机”制作,该机属于目前较