文档介绍:第 43 卷第 10 期涂料工业 Vol. 43 No. 10
2013 年 10 月 PAINT & COATINGS INDUSTRY Oct. 2013
核电站涂装国产化管理研究
张耀( 国核工程有限公司建造中心,上海 200233)
摘要: 在对国内核电机组涂装配套体系进行全面调研后,结合国内核电站涂装管理的现状,就
,
核电站涂装国产化的可行性、关键点、类别进行了具体分析。为落实涂装国产化管理需设计单位、涂
料供应商、涂装施工管理单位进行协作。设计单位需明确涂装技术文件、核电站运行安全要求、涂层
; ;
性能试验要求涂料供应商应落实资格申报、涂料试验、合格供货涂装施工管理单位应对施工质保、
涂料检查与仓储、涂装施工过程实施有效管理。
关键词: 核电站; 涂装; 国产化
( )
中图分类号: TQ 639 文献标识码: A 文章编号: 0253 - 4312 2013 10 - 0058 - 06
涂
装 Study on Coating Localization Management in Nuclear Power Plant
技
Zhang Yao
术( , , )
State Nuclear Power pany Construction Centre Shanghai 200233 China
: ,
Abstract After a survey on coatings systems for nuclear power plants in China the feasi-
bility and key points of coating localization management were analyzed based on current coating
,
management status and levels. For implementation of the coating localization management
,
closed collaborations were necessary among coating designer coatings supplier and application
,
management institution including defining the coating technical specification and safety opera-
,
tion requirements and required tests for coatings by the designer implement of a qualification
,
application and coatings tests and supply of qualified products by the coatings supplier and
quality assurance and site verification and satisfied storage & process control by the application
managem