文档介绍:Fabrication制作
Field Inspection Record现场检测记录
FIR:Section 5-4G1-
Contract : Client业主: TPI Polene Public Co.,LTD
Project项目: TPIPL Static Parts of Mechanical Equipment Erection Contract (Onshore Contract)
Name of fabrication equipment制作设备名称: Cyclone 3
Item : Section 5
Reference drawing NO.: 20063414
Name of part部件编号
Weight of equipment / part 设备部件重量 KG
The following inspections have been carried out已经进行下列检查:
Dimension check尺寸检查……………………………………………………
Tolerance – max. Deviation 最大公差值…………………………………………
Accepted in sketch图纸允许值……………………………………………………
Not accepted 不可接受值…………………………………………………………
(b) Visual control of welded connections焊接外观检查: ……………………
(c) Non-destructive test if require of weld焊接是否要求无损探伤……………
Dry-ration渗透试验…………………………………………………………
radiographic射线探伤……………………………………………………………
ultrasonic超声波探伤………………………………………………………………
(d) Visual control of primary paint coating底漆外观检查:……………………
(e) Visual control of sub-assembly bolting目测拼装螺栓连接…………………
(f)Torque control of high-strength bolt高强螺栓扭矩控制:…………………
Completeness according to drawing根据图纸完成度: ………………………
×=carried out实施 O=not yet carry out还未进行-=not required未要求
Remarks备注:
CONTRACTOR (SINOCONST5)
Foreman/ Eng. Supervisor/QC
OWNER (TPIPL)
Eng. /Asst. Apprv./Mgr
Fabrication制作
Field Inspection Record现场检测记录
FIR:Section 5-4G1-
Contract : Client业主: TPI Polene Public Co.,LTD
Project项目: TPIPL Stat