1 / 57
文档名称:

南水北调中线GPS精密控制网复测的分析研究.pdf

格式:pdf   页数:57页
下载后只包含 1 个 PDF 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

南水北调中线GPS精密控制网复测的分析研究.pdf

上传人:dp4537 2016/1/6 文件大小:0 KB

下载得到文件列表

南水北调中线GPS精密控制网复测的分析研究.pdf

文档介绍

文档介绍:Subject :Precise GPS work Research on South-to-North Water DiversionEngineering field:Surveying EngineeringName :WangLiang (Signature)Instructor:ShiJingjian(Signature)ABSTRACTThe South-to-North Water Transfer Project can alleviate the crisis of water resources in Beijing,Tianjin,North China,greatly improve the water supply area of ecology,environment and investment environment,promoting China's economic development in the central region. The South-to-North Water Transfer Project is a long-term and arduous project,due to the influence of the external environment,may cause the control point displacement or lost,to ensure the quality of the project,in the construction of the original work retest and optimization design of the actual situation,in order to test the original coordinates of control points are correct,and the work is this paper,using GPS data HC,through parative analysis of influence of GPS baseline quality of conventional surface observations,the completeness of data accuracy,quality,quantity and distribution of work,the structure and the method of data processing for work quality. Study on some requirements and contents of work optimization following conclusions:(1)The basic elements of GPS network is a GPS baseline vector,the quality of the baseline vectors determines the quality of the GPS measurement and data processing,must take appropriate quality control measures to ensure that it can meet the GPS baseline requirements of the project.(2)Try starting points distributed control network within the region,it is3or4 is best,coincidence measurement specification,accuracy can guarantee,the minimum amount of work, low cost.(3)Foraparticular work,the more the number of observations(Including GPS baseline vectors and conventional ground observations), the higher the overall quality of work,the higher the overall quality work,(4)As a result