文档介绍:丰满水电站全面治理(重建)工程机电设备安装工程蜗壳施工方案中国水利水电第六工程局有限公司丰满水电站机电安装工程项目部二〇一五年十二月十四日批准:校核:编制:目录1概述.......................................................12编制依据...................................................13蜗壳安装工艺流程...........................................14施工准备...................................................35蜗壳施工工艺.................................................................................................................................................................46蜗壳焊接工艺......................................................................................................................................................................................................77质量保证措施及控制要点............................................................................................................................................118施工资源投入......................................................................................................................................................139施工安全保证措施..........................................14蜗壳施工方案概述丰满水电站全面治理(重建)工程蜗壳部分共 26节,其中24节为“C”型壳板,进口1、2节为“〇”型壳板,每节分两个瓦片到货,蜗壳需在工地现场拼装成整节后进行挂装。蜗壳拼装成整节后的最大直径为8800mm,。蜗壳材质为低合金热轧钢板Q345R,板厚为36~50mm,蜗壳各节的对接缝为“X”型坡口。编制依据(1)中水东北勘测设计研究有限责任公司图纸:蜗壳单线图( 1/1)(2)哈尔滨电机厂有限责任公司图纸:蜗壳单线图L1a002931蜗壳装配图Z1a005709蜗壳装配单级明细表 Z1a005709M上部基础Z1a005707上部基础单级明细表 Z1a005707M(3)丰满水电站全面治理(重建)工程机电设备安装工程招标文件第三册技术规范(通用)(4)丰满水电站全面治理(重建)工程机电设备安装工程招标文件第四册技术规范(专用)(5)丰满水电站全面治理(重建)工程机电设备安装工程施工组织设计(6)《水轮发电机组安装技术规范》 GB/T8564-2003蜗壳安装工艺流程蜗壳安装工艺流程图见图 1-11施工准备↓蜗壳的拼装 → 蜗壳定位节的挂装↓蜗壳其余节的挂装↓蜗壳环缝的焊接↓蜗壳凑合节的安装↓蜗壳凑合节纵缝的焊接↓测量管路的安装、实验 ← 蜗壳凑合节环缝的焊接↓座环导流板的装焊 ← 蜗壳与座环过渡板环缝的焊接↓蜗壳与座环舌板焊缝的焊接↓蜗壳焊缝的探伤↓蜗壳支撑的安装↓蜗壳弹性层安装↓蜗壳混凝土浇筑图1-1 工艺流程图2施工准备(1)施工前,对施工人员进行技术交底、安全生产措施交底、文明施工教育,组织施工人员认真学习、熟悉厂家图纸、设备安装说明书、国家标准、安全文明施工等。(2)设备安装前进行全面清点、检查,并复核蜗壳到货尺寸,如有缺陷或损坏及时上报监理、厂家。(3)准备拼装及挂装用的工器具、焊接设备、焊接材料等。(4)根据上部基础设计图纸,在混凝土施工过程中埋设相应的基础板、锚钩等。(1)蜗壳拼装从定位节第 5节、第14节开始,在