文档介绍:Data Center Projects:
Commissioning


White Paper 148
Revision 1
by Dennis Bouley
Contents
> Executive summary Click on a section to jump to it
Introduction 2
Failure to mission a data center leaves the
door wide open for expensive and disruptive downtime Definition missioning 2
that could have been avoided. mission-
ing of all physical ponents assures Outputs missioning 3
maximum data center performance and justifies the
physical infrastructure investment. This paper reviews Inputs missioning 6
the desired outputs and identifies the standard inputs missioning works 8
of missioning data center project step. The
commissioning process flow is described and missioning process 8
ess factors are discussed. missioning
process inputs and outputs are also placed in context Tools 12
with other key data center project process phases anization 15
steps.
Conclusion 16
Resources 17
Data Center Projects: Commissioning




Introduction When building a new data center, the owner of the data center has no guarantee that the
various physical infrastructure subsystems – power, cooling, fire suppression, security, and
management – will work together. Commissioning is the process that reviews and tests the
data center’s physical infrastructure design as a holistic system in order to assure the highest
level of reliability.

missioning is a daunting task. Since formal system operation doesn’t begin
until the system missioned, missioning team experiences intense pressure to
complete missioning process quickly. Commissioning can involve high expense and
requires staffs from different departmental disciplines to work together. For these reasons
data missioning has almost uniquely been associated with large data centers
(over 20,000 ft2 or 1,858 m2). In the recent past, many data center managers chose to roll the
dice and perform little or missioning, relying only on start-up data to