1 / 76
文档名称:

某本科生供电系统设计本科生毕业论文.doc

格式:doc   页数:76页
下载后只包含 1 个 DOC 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

某本科生供电系统设计本科生毕业论文.doc

上传人:麒麟才子 2016/4/14 文件大小:0 KB

下载得到文件列表

某本科生供电系统设计本科生毕业论文.doc

相关文档

文档介绍

文档介绍:学号毕业设计说明书某大学供电系统设计学 生姓名专 业名称电气工程及其自动化指 导教师电子与信息工程系年月日某大学供电系统设计 The Power System Designing for XX University 摘要通过对设计任务工程背景的分析,确定了各变电所高低压主接线结构,并根据电源情况、负荷水平与功率因数要求等条件对全系统进行了详细设计。首先,计算实际负荷, 选择 10kV 供电用变压器。届时已考虑到无功功率补偿因素,由此可以免去部分迭代过程, 计算较为简便。在进行上述设计过程中,确定了无功功率补偿容量,得出计算负荷,由此选择线缆。根据总计算负荷选择 35kV 供电用变压器并进行无功功率补偿。其次,通过对系统的短路计算分析,选择高低压断路器、高压隔离开关、开关柜和互感器。再次, 对35kV 和10kV 变电所的平面布置、照明、接地和防雷进行设计。最后,根据系统需求进行了计量、测量、保护与控制等二次回路设计。关键词: 供电系统;负荷计算;短路计算;继电保护 ABSTRACT This design determine d the high and low voltage main structure for each substation by the actual situation of the project , and finish ed detail for the entire system according to the p ower situation , the load level , the power factor and other conditions. Firstly , the 10kV power transformers were select edby the actual load calculate d. The reactive pensation was considered when select ed the 10kV power transformers .Ap artof iterative process was removed , so calculation is relatively simple. In the course of that, calculat ion of pensation capacity, power load , cable standard were s elect ed. 35kV power transformers was selected base on the total power load ,the reactive pensation was proceed. Secondly , high and low voltage circuit breakers , high voltage isolation switch, switch s and transformers were choosed through a nalyze s for system short-circuit calculation . Thirdly , l ayout, lighting, grounding and lightning protection for 35kV and 10kV substation were d evise d. Finally, the secondary circuit with estimate , measurement , protection and control were d evise d according to the system requirements . Key words: Power s ystem ; Load calculation ;S hort-circuit calculation ;R elay protection 目录第1章设计内容概况........................................................................................................... 1 设计原始依据................................................................................................................ 1 全部用电设备负荷情况..............................................................