文档介绍:CO-Training Overview Product Costing
CO-Training
Overview Product Costing
CO-PC
*
Contents of Submodule Product Costing CO-PC
Cost Object Controlling
plan calculation based on the calculated Standard price of semi-finished/finished good for
- Production orders (PP module)
(- Sales orders (with Product Cost Collectors SD module)) (- inventory managed Internal orders (CO-OPA module))
delivers basic information for processes like pricing, stock valuation, result analysis and the determination of imminent loss according to mercial financial statement
Material Calculation
calculation of Standard prices for semi-finished and finished goods
calculation with quantity structure from the logistic module (Bill of Material BOM, Routing)
material calculation with contents from different SAP modules (MM, PP, CO)
*
Product Costing – SAP menu
Master data in CO-PC
Relevant master data for product costing are fields in material master data, bill of material, routing and work centers1>. For overhead calculations percentage overhead rates have to be maintained (plan).
For product cost controlling, master data for production orders (lot-size-based) or product cost collectors (for serial production) are created (in PP). For actual postings on the orders, the bill of material and routing which has been defined in PP for each order is relevant. For overhead calculations percentage overhead rates have to be maintained (actual)
*
Contents of a Material Calculation: Material Master
Costing variant
- costing type
- valuation variant
- date control
- quantity structure control
- transfer control
Material Master
BOM / Routing
ponent Structure
Costing Sheet
*
Contents of a Material Calculation: Material Master (1)
costing relevant views in Material master
*
Contents of a Material Calculation: Material Master (2)
Costing 5>view 1
relevant Profit Center stored in Material Master
activated flag for calculation with quantity structure
origin gr