文档介绍:目录第一章编制依据及工程概况························2一、编制依据···································2二、工程概况···································2第二章土方工程施工准备··························3一、施工技术准备································3二、施工现场准备·······························3三、机械设备需用量准备·························4第三章施工进度计划及劳动力计划···················4一、施工进度计划······························4二、劳动力计划································4第四章基坑施工现场管理····························5一、平面布置··································5二、施工现场管理·······························5第五章主要施工方法·······························6一、测量放线···································6二、土方开挖···································7三、边坡修正、锚杆护壁·························9四、质量问题的处理·····························9第六章基坑降排水技术措施························10第七章组织措施···································10第一章编制依据及工程概况一、《贵州省三都县县府西路改造开发项目总平面图》《贵州省三都县县府西路改造开发项目3#楼地下室施工图》《三都县县府西路改造开发项目3号地块岩石工程勘察报告》:1)《建筑地基基础设计规范》GB50007-20022)《地基与基础工程施工操作规程》YSJ402-893)《地下工程防水技术规范》GB50108-20084)《建筑地基处理技术规范》JGJ79-20025)《建筑桩基技术规范》JGJ94-20086)《建筑基坑支护技术规程》JGJ120-20127)《建筑基坑工程检测技术规程》GB50497-2009二、:建设单位:贵州华洲实业有限公司勘测单位:深圳市勘察测绘院有限公司设计单位:重庆大有建筑设计院监理单位:黔南州建设监理有限责任公司三都分公司施工单位:,场地南为建设西路,西临该改造开发项目2号地块。土壤结构较为复杂,以砂卵石为主。设计地下车库一层,根据建设单位3号地块情况,该土石方开挖标高约为-。㎡(其中地下车库面积1285㎡);建筑主要结构形式为框肢剪力墙结构,设计合理使用年限为50年,结构的抗震设防烈度为6度;本工程其耐火等级为地上一级,地下一级;屋面防水等级为Ⅱ级;人防工程为异地人防。第二章土方工程施工准备施工技术准备1、熟悉设计图纸和工程地质情况;2、报请相关部门做好定位放线的核验工作,完善各项手续;3、测量交底与复测;4、办理相关申报手续,落实文明施工措施。5、掌握天气情况,准备足够的基坑排水设备及护坡材料,尽可能避免雨天开挖基础。6、组织施工技术交底。二、施工现场准备(1)清查地下管线,管网,发现军事、通讯光缆须报有关部门及时处理。(2)工程轴线控制网测量定位及控制桩、控制点的保护。(3)临时供电(4)临时排水(5)生产、生活设施(6)施工现场道路三、机械设备需用量准备主要施工机械、设备表机具设备名称单位数量反铲挖掘机台2自卸汽车辆10全站仪台1水准仪台1锚杆机械台若干(具体见专业队伍方案)第三章施工进度计划及劳动力计划一、施工进度计划根据现场情况并结合总施工进度计划需求,本工程地下室土方开挖计划工期15天,其中开始时间为2013年10月5日,结束时间在2013年10月20日。二、劳动力计划本工程施工劳动力投入计划表分项工程工种挖土基坑清底防护工程基坑边坡护壁测量工333钢筋工混凝土工架子工电焊工机工详见护壁方案电工111泥工004机修工200电焊工000普工12206保卫人员222清洁工444基坑施工现场管理一、平面布置根据工程设计文件及图纸、工程地质报告、公司