文档介绍:客户抱怨回复报告
Customer Compla in Reply Report
诉怨日期 Complain Date :
回复日期 Reply Date : 经办 Prepared By
客户 Customer.:
报告编号Report No.:
核准 Approved By :
主题 SUBT: Studs of the cab in et bottom broken
1 问题描述(Problem Description):
Fron tech customer found there was tran sformer moveme nt in side the UPS, and Umax & Fron tech customer found in some units the Studs of the cabinet bottom were broken, and the transformer clamps < bending. Pictures as below.
2、问题处理成员(Team Members 3、原因分析(Root Cause Analysi9 :
)it
1. The transformer movement issue: Leades transformer had used small clamps, some clamps may not be fully tight, and the gaps of the studs were a bit large, so the in some cases the transformer have a moveme nt, picture as below.
2. The Studs of the cabinet bottom were broken: it seems the UPS was dropped from high height , we have done the drop test to check this problem, no rmally this problem cannot happe n.
4、临时性措施(Short-Term Corrective Action):
Repair the failed un its.
5、长期性措施(Long-Term Corrective Action ):
For this loose fitting of transformer issue, we have already changed the transformer clamp, it can fix the tran sformer full tigh