2 2
摘要结合新广州站站房桥的工程实例,叙述了鱼腹式槽型截面 V形刚构组合连续箱梁原位现浇施工的主要施
工工艺及关键技术,重点介绍了特大断面 V形刚构结构现浇支架方案及施工控制要点和方法,为今后类似工程施
工提供一些借鉴。
关键词客运专线 V形刚构连续梁施工技术
中图分类号 U215. 7 文献标识码 B 文章编号 1009 4539 (2009) 07 0109 04
Con struction Technology of V shaped R ig id fram b ined Con tinuous Beam
Yua n Yi
(China Railway 22 th Bureau Group Co. L td. , Beijing 100043, China)
Abstract According to the new Guangzhou railway station bridge house p roject, the paper describes the main construction
craft and key technology of the in situ cast in p lace construction of the V shaped rigid bined fish belly channel
section continuous box girder. It focuses on introducing the support p rogram of the special large cross section V shaped rig
id frame structure and the key points and methods of the cast in situ construction, p rovides some reference for the future
construction of sim ilar p rojects.
Key words passenger dedicated line; V shaped rigid bined continuous beam; construction technology
结构,支点梁高为 5. 4 m ,跨中梁高为 3. 5 m,边支座
1 概述
中心线至梁端 6. 8 m。桥面宽 13. 1 m , 顶板厚
新广州站是国家中长期铁路网规划中“四纵”客 0. 5 m,底板厚 0. 5 m,中腹板厚 1. 5 m,边腹板厚
运专线之一———武广客运专线的重要组成部分。站 1. 2 m,支点横隔板宽度为 2. 0 m。V 形结构斜腿及
场设计 28股道, 15座旅客站台。新广州站采用站桥桥墩为实体截面。全桥分 19个施工节段。
共柱形式,站房桥承担铁路和站房双重荷载。站房桥
3 桥型特点及施工难点
桥梁共 14座,起讫里程为 DK2218 + 270.