文档介绍:三兄刀具
文件编号
SX-PE-001
文件名称:
版 本
A
生效日期
2013-09-15
工程开发部管理制度
页 次
第23页·共12页
several group number, then with b ±001
文件名称:
版 本
A
生效日期
2013-09-15
工程开发部管理制度
页 次
第23页·共12页
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured 23 / 24
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured

适用于工程开发部。

〔一〕部门组织架构图
〔二〕部门岗位职责

序号
职责模块
职 责 内 容
工作频率
对应流程
日常
周期
随机
1
新产品开发
对新产品的可行性评估

《新产品开发流程》
对新产品的工艺评估与成本预算

2
样板试制
1〕监督审核试制工艺的生产可行性