空调无组织排放凝结水易引起上下楼层居lation, indoor water
supply and drainage system consists of the following parts: the
introduction of pipe, water meter nodes, water supply equipment (pumps),
horizontal ZhuGanGuan, vertical pipe and branch pipe and valve
components. Water pump water pumps, valves, etc is hub inside the room,
installation of good quality, will be able to make the engineering of water
supply system operation more reliable and safety of person and
equipment service life is also more secure, for its installation request is as
follows:
(1)设备安装前应对其有关资料和文件合格证进行核对检查。
(1) before the installation, should undertake checking checking to the
relevant data and documents on the certificate.
(2)设备不应有缺件、损坏和锈蚀,而转动部分应无阻滞、 空调无组织排放凝结水易引起上下楼层居民纠纷
住现象和异常声音。
(2) the equipment should not be missing parts, damage and corrosion, and
the rotating part should be no block, stuck phenomenon and abnormal
sound.
(3)对设备机组的安装是根据已经确定的水泵机组型号、机组
的台数和机组的长度尺寸合理地规划其在水泵房中的安装位置和纵
横排列形式。机组布置应使管线最短,弯头最少,管路便于连接和留
有一定的走道和空间,以便于管理、操作和维修。
Unit (3) the equipment is installed according to the established model of
pump unit, and sets the length of the unit size of the reasonable planning
and its position in the installation of the pump house and arranged to form.
Unit decorate should make pipeline shortest, elbow least, pipe is easy to
connect and leave certain aisle and space, in order to facilitate
management, operation and maintenance.
(4)引入管与其他管道应保持一定的距离,如与室内污水排出
管平行敷设,其外壁水平间距不小于 ,如与电缆平行敷设,其
间距小于 。当小区内的道路宽度小,管线在道路下排列困难时,
可将部分管线移至绿地内。 空调无组织排放凝结水易引起上下楼层居民纠纷
(4) the introduction of pipe with other pipes should keep a certain
distance, such as with indoo