文档介绍:
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate sierrors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured3
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured6
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
毕业论文(设计)写作计划
( 2014年12 月 20 日 至 2015年 05 月 20 日)
起讫时间
论文各工作阶段的