several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size求而得到批准,且影响其他用户的停电。
3、限电:是指由于系统电源容量缺乏或供电网络故障,临时采取减少客户用电负荷的措施;用户拖欠电费、违章用电等依法采取停电的措施;其他特殊原因,不限电有可能造成线路过负荷跳闸、大面积停电或给局造成经济损失和其他严重影响的。
4、故障、应急处理停电:指由于系统内、外部故障而引起的停电或电力设备的紧急缺陷处理停电。
二、职责分工
1、生产技术部负责变电设备、35KV线路、10KV配电线路及设备〔包括线路主干、分支、分段、联络开关〕的方案停电和临时停电的管理。
2、农电工作部负责对10KV配电变压器、400V线路的方案停电和临时停电的管理,按月报生产技术部备案。
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box