文档介绍:建筑给排水及采暖施工组织设计
德城区馨秋社区后寨子村安置楼6#、11#住宅楼工程给排水及采暖施工组织设计
several group number, then with b values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured8
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured14
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
施工任务,我公司选派技术能力强,施工经验丰富的许书刚同志作为该工程给、排水及采暖安装工程负责人,全面负责该工程的给、排水及采暖安装工作。(管理人员名单见附表-1)
工程前期及时组织施工图纸的会审交底,准确做好施工预算,做好预埋、预留工作,做好各工种的上岗持证培训工作。
基础及主体施工阶段,安排3人进行预留工作;进入施工高峰期时,计划投入劳动力15人。以上人员可根据工程进展情况进行合理调整,确保工程施工进度。
工程前期与业主明确甲、乙双方的职责义务,有计划的分批合理安排材料进场,并根据施工进度实际情况,材料部门提前做好材料的准备工作,保证及时供应合格的材料。
:详见附表-2。
:
本工程排水管采用塑料排水管,连接方式为粘接。
,连接时应将承插口擦试干净,如有油污用***除掉。