文档介绍:AGREEMENT OF BOT PROJECT
this agreement is made and entered into by and between the government of_____________(hereinafter called 'b') represented by________(hereinafter called 'a') and __________corporation, pany anized and existing under the laws of the people's republic of china with its principal office at___________(hereinafter called 'c').
whereas, a and c concluded the memorandum concerning __________project on the ____________and c had been given exclusive right from b to carry out investigation and implement ____________project (hereinafter called 'the project') by way of joint financing between c and b (so called bot).
whereas, the loan agreement, guarantee agreement, letter of guarantee, etc. shall constitute ponents of this agreement. the project's installed capacity is __________.
now therefore, the parties hereby agree as follows:
1. definition and interpretation
'project' means the planning, feasibility study, design and engineering, construction, equipping, completion, testing, commissioning and operation of the infrastructure project.
'project cost' means the cost specified in clause 3.
'operation period' means the period specified in clause from the starting date mercial operation of the infrastructure project.
'completion date' means the day upon which c certifies that the infrastructure project has pleted its testing and can sta