文档介绍:several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremenor measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
学习文档 仅供参考
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
招标阶段
招标项目
销售在接到客户招标邀请后,第一时间将招标文件发给售前支持部,抄送产品研发部、市场管理部、销售区域经理、周总、孙总。
市场管理部接到招标文件后,由投标专员和售前支持部、产品研发部、项目实施部沟通确认参与本次项目投标人员名单。
投标小组人员名单确认后,由市场管理部投标专员牵头组织销售、销售区域经理、售前支持部、产品研发部、项目实施部负责投标人员召开标前准备会〔包括阅读投标文件、投标文件制作分工及时间安排〕,会后由市场管理部投标专员形成纪要发给参会人员〔邀请周总和孙总参会〕。
投标文件制作过程中,如遇到一些重要的技术难点,或一些敏感问题以及配置中涉及现场环境确认〔如机柜型号、交流/直流电源等〕,由售前支持部牵头组织销售、销售区域经理、产品研发部、项目实施部投标接口人员、市场管理部投标专员召开会议商讨,会后由售前支持部形成纪要发给参会人员。
投标文件制作完成后,由市场管理部投标专员汇总投标文件并发送售前支持部、产品研发部、销售区域经理、周总、孙总进行投标前审核〔包括技术方案的可行性、技术标准书点对点应答、商务条款应答、以及项目成本及风险评估〕,并由市场管理部组织完成CRC初审,初审通过后市