1 / 45
文档名称:

3 outfitting (eva).doc

格式:doc   大小:246KB   页数:45页
下载后只包含 1 个 DOC 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

3 outfitting (eva).doc

上传人:wo1230 2017/2/4 文件大小:246 KB

下载得到文件列表

3 outfitting (eva).doc

相关文档

文档介绍

文档介绍:3- 1 3- HULL OUTFITTING MAN O EUVRING SYSTEM STEERING GEAR One (1) set of electro-hydraulic, 1 rams –2 cylinders type steering gear to be installed in the steering gear room. The steering gear to consist of two (2) hydraulic cylinders of cast iron, one (1) rams of carbon steel, one(1) tiller arm of cast steel with the key, two(2) electro-hydraulic pump units, valves box, hydraulic piping, instruments, etc. The steering gear shall be connected to the rudder stock by key with hydr aulic m ethod. Each of the electro-hydraulic pump units shall have 100% of the capacity a nd will be solenoid valve operated. All parts of the steering gear to be designed and equipped in accordance with the requirements of the Classification Society and the Regulatory Bodies. The steering gear to be operated by one of the power unit s, while the other unit to be of stand-by. The steering gear to be capable of putting the rudder from 35 deg. on one side to 35 deg. on the other side with the vessel running ahead at the summer load waterline with the maximum continuous rated power of the main engine. The capacity of each power unit to be suitable for supplying the sufficient power for steering the rudder from 35 deg. on either side to 30 deg. on the other side within 28 seconds under the above condition. The steering gear is to be incorporated with auto pilot system. The steering gear shall also be controlled manually bya local control device, fitted on th e steering gear in steering gear room, for an emergency operation. Efficient means munication with the wheelhouse to be provided adj 3- 2 acent to the local control device. In case of main power failure, electric power to be fed from emergency generator to one of the power units automatically within 45 seconds in order to steer the rudder and be capable of putting the rudder over from 15 degrees on the other side in not more than 60 seconds with the ship at it’s deepest seagoing draft and running ahead at one half of the maximum ah

最近更新

2025年度按时缴纳证券交易印花税担保协议 13页

2019年四川省宜宾市中考历史真题及答案 5页

2025年度新能源汽车车辆挂靠合作服务协议范本.. 15页

2025年度智慧交通信号监控合同样本 16页

2019下半年教师资格幼儿保教知识与能力真题及.. 10页

2018年重庆涪陵中考化学真题及答案A卷 7页

2025年度材料采购与智能制造解决方案服务合同.. 15页

2025年度步行街个人店铺租赁与节假日营销策划.. 15页

2025年度消防系统智能化设计合同 3页

2025年度环保设施施工合同补充协议 3页

2025年度电子信息设备采购合同四 15页

2018四川省遂宁市中考政治真题及答案 8页

2025年度精品别墅租赁合同 13页

2025年度绿色生态白酒品牌代理合作协议范本 14页

2025年度职业规划与求职辅导培训合同模板 18页

2025年度郴州市保安公司员工薪酬福利管理合同.. 16页

2025年度高品质瓷砖产品代理销售合作协议书 15页

2025年度高端物业清洁服务合同书 15页

2025年成都物业服务质量考核合同范本 14页

2025年文化设施安装施工合同协议书范本 17页

2025年施工现场安全防护设施设计及安装服务合.. 16页

2023年湖南常德中考物理真题及答案 22页

2025年电梯工程智能化控制系统集成合同 16页

2025年茶叶品牌宣传推广合同范本(广告合作).. 16页

2025年重庆建筑工程职业学院单招职业技能考试.. 56页

2025年重庆护理职业学院单招职业适应性考试题.. 57页

《雷达基本工作原理》PPT课件 36页

职称过渡说明 6页

血透患者入院须知 2页

上海实验学校幼升小测试题 34页