文档介绍:毕业论文——电气化铁路接触网施工技术
of accountability, redress of orders and prohibitions. Strengthening the honesty and self-
接触网支柱整正 12
硬横梁安装 14
隧道内吊柱安装 17
支柱装配预配安装 18
预配工艺流程 18
预配操作方法 18
接触网架设 21
承力索架设 21
接触线架设 24
接触网静态检测和动态检测 27
静态检测 27
低速动态检测〔冷滑试验〕 27
接触网送电〔空载带电〕 27
动态检测〔热滑试验〕 28
结 论 29
总结与体会 30
致 谢 31
参考文献 32
of accountability, redress of orders and prohibitions. Strengthening the honesty and self-discipline of leading cadres honesty in politics and education work, enhance leaders ability to resist
of accountability, redress of orders and prohibitions. Strengthening the honesty and self-discipline of leading cadres honesty in politics and education work, enhance leaders ability to resist
第II页
摘 要
接触网、电力机车和牵引变电所并称为电气化铁道的“三大元件〞,而接触网是电气化铁道牵引供电系统中唯一的无备用供电设备,其运营状态的好坏直接关系到电气化铁道的平安运行和经济效益,所以电气化铁道建设最重要的一局部就是接触网施工。
本文主要介绍新建电气化铁路的接触网施工技术,总结新线接触网施工的整体流程。为了更好地阐述,本文还介绍了接触网的根本组成。
【关键词】:电气化铁道;接触网;施工
of accountability, redress of orders and prohibitions. Strengthening the honesty and self-discipline of leading cadres honesty in politics and education work, enhance leaders ability to resist
of accountability, redress of orders and prohibitions. Strengthening the honesty and self-discipline of leading cadres honesty in politics and education work, enhance leaders ability to resist
第III页
Abstract
Catenary, Electric Locomotive and Traction Substation known as the "three components" .Catenary is the only non-standby power supply equipment in electrified railway traction power supply system. Its operational status is directly related to the safe operation of the electrified railway and economic benefits .Therefore, the most important part of the construction of electrified railway is catenary construction.
This paper describes the construction of the new electrified railway catenary technology. Sum up the overall process