1 / 20
文档名称:

最新参考文献 外文翻译 致谢.docx

格式:docx   大小:29KB   页数:20页
下载后只包含 1 个 DOCX 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

最新参考文献 外文翻译 致谢.docx

上传人:lu2yuwb 2022/8/12 文件大小:29 KB

下载得到文件列表

最新参考文献 外文翻译 致谢.docx

文档介绍

文档介绍:several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremen营管理的经验和教训,充分了解工程招投标中价格形成机制的特点和运行规律,对工程造价进行有效的控制,利用好两种资源,开拓两个市场,提高企业经济效益。 
2、工程招投标价格形成机制
  建设工程造价,一般是指进行某项工程所花费〔指预期花费或实际花费〕的全部费用。它是一种动态投资。它的运动受价值规律、货币流通规律和商品供求规律的支配。因此在承包工程投标报价计算中我们要运用决策理论、会计学、经济学等理论评定报价策略,经过从行政上、技术上和商务上进行全面鉴别、比拟以后采用科学的计算方法和切合实际的计价依据,合理确定工程造价,使其报价中标。
⑴我国现行工程造价计价依据的特点
  由于我国现行的工程造价管理制度是在方案经济模式下建立的,无视了企业独立的经济地位,国家直接参与管理活动,直接制定和控
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for