1 / 44
文档名称:

最新农业社会化服务工程项目指南.doc

格式:doc   大小:119KB   页数:44页
下载后只包含 1 个 DOC 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

最新农业社会化服务工程项目指南.doc

上传人:lu2yuwb 2022/8/14 文件大小:119 KB

下载得到文件列表

最新农业社会化服务工程项目指南.doc

文档介绍

文档介绍:jp
of rural drinking water sources, protection of drinking water sources in rural areas by the end of the delimitation 报书格式。每个工程县〔市、区〕按工程申报书应包括工程承当单位、工程可行性和必要性、技术措施和组织措施、实施地点、经费概算等。
(2)报送时间:截止4月30日。申报书按有关要求报送省农田建设与土壤肥料技术总站〔3份〕和厅计财处〔1份〕。另向省农田建设与土壤肥料技术总站报送word文档软盘、电子邮件〔E-mail:******@163 〕。
(3)有关事宜联系:省农田建设与土壤肥料技术总站土壤科, :0591-87814211。
jp
of rural drinking water sources, protection of drinking water sources in rural areas by the end of the delimitation of the scope of protection, complete with warning signs, isolating network protection facilities
of rural drinking water sources, protection of drinking water sources in rural areas by the end of the delimitation of the scope of protection, complete with warning signs, isolating network protection facilitieszl
of rural drinking water sources, protection of drinking water sources in rural areas by the end of the delimitation of the scope of protection, complete with warning signs, isolating network protection facilities
附件:
测土配方施肥示范工程申报书
工程单位全称:
通 讯 地 址:
邮 政 编 码:
法人代表姓名:
联 系 电 话:
主 管 部 门:
编 制 日 期:
福建省农业厅制
jp
of rural drinking water sources, protection of drinking water sources in rural areas by the end of the delimitation of the scope of protection, complete with warning signs, isolating network protection facilities
of rural drinking water sources, protection of drinking water sources in rural areas by the end of the delimitation of the scope of protection, complete with warning signs, isolating network protection facilitieszl
of rural drinking water sources, protection of drinking water sources in rural areas by the end of the delimitation of the scope of protection, complete with warning signs, isolating network protection facilities
一、工程任务情况
〔一〕来由
〔二〕年度目标
〔三〕实施内容
〔四〕工程预算〔包括工程资金支出内容、任务数量、支出标准和支出金额〕
二、工程单位情况
〔一〕单位性质,隶属关系,相关职能业务范围和主要优势
〔二〕工程主要人员情况与任务分工
〔三〕有无不良诚信记录
三、相关单位情况
四、工程实施步骤与进度安排
五、工程单位及其主管部门意见
工程