文档介绍:Smart Grid 智能电网, 2017, 7(1), 16-27
Published Online February 2017 in Hans. rnal/sg
https:///.71003
Research on the County Adjustment Setting
Integrated System Based on the Extension of
Protecting and Coordinating Boundary
Xia Lin1, Yueting Wang2, Qiang Li1, Fengzi Tian1, Qian Shen3, Qitao Zhu1
1State Grid Zaozhuang Power pany, Zaozhuang Shandong
2State Grid Yantai Power pany, Yantai Shandong
3State Grid Jinan Power pany, Jinan Shandong
Received: Feb. 5th, 2017; accepted: Feb. 25th, 2017; published: Feb. 28th, 2017
Abstract
In order to achieve the “first-class work” construction goal, the original scheme
focusing on the demand of the electric power system is changed into the other bined with
the user’s demand. The line switch protects transient time of the instantaneous period in the set-
ting value strategy, and coordinates with boundary switch protection. It extends the original pro-
tected boundary to important users downstream, and coordinates with the transformer substa-
tion upstream, forming a set of relatively constant value based on the substation transformer. At
the same time, with the coordination of boundary switch, intermediate switch of long transmis-
sion lines and its related protection section, the characteristics of the original protection scheme
are e, namely, relying on the length of transmission lines and failure to guarantee the se-
lective coordination because of the influence of the operation mode. On this basis, the “county ad-
justment setting integrated system” can be effectively achieved so as to realize the automation of
work setting management.
Keywords
First-Class work, Protecting and Coordinating Boundary, Delivered Instant
Protection, County Adjustment Setting Integrated System, Automation of work
Setting Management
基于保护配合边界扩展的地县调整定
一体化系统的研究
林霞1,王玥婷2,李强1,田凤字1,沈倩3,朱其涛1
文章引用: 林霞, 王玥婷, 李强, 田凤字, 沈倩, 朱其涛. 基于保护配合边