1 / 4
文档名称:

信息化建设ROI分析ROI.pdf

格式:pdf   页数:4
下载后只包含 1 个 PDF 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

信息化建设ROI分析ROI.pdf

上传人:管理资源吧 2012/2/12 文件大小:0 KB

下载得到文件列表

信息化建设ROI分析ROI.pdf

文档介绍

文档介绍:The“ThreeRs”
By Kim E. Ruyle
Oversimplification of cost wo of the most important factors invested e from free cash
affecting any corporate investment flow—whatever cash is left after -
justification processes is a decision are the time value of pany takes what it needs for operations
real danger in calculating ofROImoney and the inherent risk of the and investment for the future.
Tinvestment. Both of these factors If an EPSS project, or any project, can
return-on-investment. Walk are considered in the following overview generate free cash flow at least equal to
through this cost-benefit of the basics of justifying investment in other projects available to pany,
an electronic performance support sys- it will normally be approved. (Of course,
analysis for an EPSS project, tem project. this assumes that pany has some
which notes oft-forgotten acceptable projects to invest in.)
Corporate Finance 101 Many projects proposed in business
ROI calculation details. Grand and glorious mission statements only generate free cash flow indirectly.
notwithstanding, the real mission of every Such projects are proposed as activities
for-pany is to generate an that will increase market share, improve
acceptable return on invested capital. product quality, or plish some other
In This Story What constitutes an acceptable return purpose that management believes wil