1 / 19
文档名称:

港口布置与规划.ppt

格式:ppt   大小:3,202KB   页数:19页
下载后只包含 1 个 PPT 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

港口布置与规划.ppt

上传人:今晚不太方便 2017/11/20 文件大小:3.13 MB

下载得到文件列表

港口布置与规划.ppt

文档介绍

文档介绍:XB Port
Port Planning & Layout
We choose a place to build the port in Ventura.
The port locates between Emma Wood State Beach and Ventura Raceway. There is a natural closed harbor , we decided to open it from west to east io oder to let the ships in and dock also connect to the Ventura River for transporting. The wave height around here is about 1 meter and the peak period last about
wave
The es from west to east so we build a bulwark here to block it.
wind
The speed of wind is about and the ship can sail into the port easily.
earthquake and tide
Carpinteria is located in the circle-Pacific seismic belt, but the frequency of earthquakes is smaller,the magnitude of earthquakes is lower.
As the right picture saying,the hightest tide close 6 meters,So we need consider the construction of hydraulic structures to resist waves and tides。
XB Port
We choose a place to build the port in have selected the super Panamax container ship that 80000 DWT , 7000 TEU and 330 *43 * 14 (captain * width * full draft)
container loading mode
The survival of the fittest era of our XB port with a world-class port handling technology, advanced management technology reference port of Rotterdam port, so that we can among the ports in the world.
Our container loading mode: Ship - shore bridge - tractor - rail mounted gantry crane - yard
years of the number of TEU and coal cosumption
we use the time series method to calculate the 2015 container quantity 2555902,
coal consumption was 20088265.
Berth capacity estimation method N = Q/P
N------The number of berths
Q------Terminal operations
P------The ability of a single terminal a year
N=2250000
P=TGρ╱{(tz╱td-∑t)+tf/td}
tz=G/p
T=365
G=7000
p=80 to 90
∑t=3h
ρ=60%
tf=6h
SO tz=7000/85=
pt=365*7000/{[/(24-3)]+6/24}
pt=612500
SO Berth capacity=612500
SO N= we use N=4