1 / 40
文档名称:

普华--customer focused inventory management.ppt

格式:ppt   页数:40
下载后只包含 1 个 PPT 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

普华--customer focused inventory management.ppt

上传人:管理资源吧 2012/2/24 文件大小:0 KB

下载得到文件列表

普华--customer focused inventory management.ppt

文档介绍

文档介绍:Customer Focused Inventory Management (CFIM) Programs
Table of Contents
Semiconductor Industry Characteristics and High Tech Industry Dynamics
Questions surrounding CFIM – What, How, When and with Whom
Impact on Operating Model
Maximizing Benefits from a CFIM program
Case Studies - Summary
Key Learnings
mendations
Back Up
Semiconductor Industry Characteristics
The semiconductor industry is inherently challenging, defined by:
plex, multi-node value web that includes multiple entities and trading partners, driving the need for munication between vendors and customers to manage the demand signal
A significant mismatch between manufacturing lead time (~ 48 days) and order fulfillment cycle times (~ 15 days) that drives forecast-based production
The uncertainty of such forecasts invariably leads to excess inventory
An environment in which a majority of the inventory resides post fab
In wafer banks pre and post test, and in die banks pre and post package, and in some cases as finished goods
As a result, small changes in demand will cause large perturbations in supply resulting in significant inventory management challenges
Impact to Strategic Operating Model: Push to Pull
Total available product to meet customer demand is equal to the finished goods inventory plus the product which can be produced and delivered within the customer's cycle time
H
L
T1
T2
Time
Demand Volatility
H
L
T1
T2
Time
Inventory
Manufacturing Output
FG Inv
FG Inv
FG Inv
FG Inv
FG Inv
FG Inv
FG Inv
FG Inv
FG Inv
Fill Demand from Inventory
Fill Demand from Inventory and Manufacturing
Use Finished Goods Inventory for Capacity Limitations and Demand Volatility
PUSH Into FG
PULL from Mfg
Migration
H
L
Total Available Product
Manufacture to
Forecast
Manufacture to
FG Replenishment
Manufacture to
Demand
Migration from a “Push” system to a “Pull” system is achieved when product is produced based on demand and replenishment needs, and less on forecast
买卖双方力量制衡对存货