文档介绍:Center for Hydro-informatics in River Basin (CHIRB)
水利信息化与流域管理知识中心
黄河下游堤坝安全监测系统研究及应用
Developing and Application of the Monitoring System of
River Training Works Safety for the Lower Yellow River
黄委会河南黄河河务局
2008年10月16日
Yellow River Henan Administration Bureau,
, 2008
The views expressed in this paper are the views of the authors and do not necessarily reflect the views or policies of the Asian
Development Bank (ADB), or its Board of Directors, or the governments they represent. ADB does not guarantee the accuracy 
of the data included in this paper and accepts no responsibility for any consequences of their use. Terminology used may not 
necessarily be consistent with ADB official terms.
Center for Hydro-informatics in River Basin (CHIRB)
水利信息化与流域管理知识中心
Outline of presentation
1 Background of development
position of the safety monitoring system
3 Technical principle
4 Examples of essful application
5 Benefits analysis
1 系统研发背景
2 坝岸安全监测系统的组成
3 技术原理
4 成果应用及效果
5 效益分析
Center for Hydro-informatics in River Basin (CHIRB)
水利信息化与流域管理知识中心
of development
¾ Thousands of groins of river training works were built on the
Lower Yellow River
¾ 黄河下游修建了数千道河道整治工程的丁坝
Shuangjing Huayuankou
Dike Dike
Main channel
Floodplain Floodplain
Cross section of the Yellow River
floodplain
Main channel
Characteristics:
wide river channel
Course wandering and changing
Main flow swings
5~20km
Dike Dike
Main channel
floodplain floodplain
Cross section of the Yellow River
floodplain
Diagonal river
Dike Dike
Main channel
floodplain floodplain
Cross section of the Yellow River
Floodplain
Transverse river
Dike Dike
Main channel
Floodplain Floodplain
Cross section of the Yellow River
Flooding along the river Flooding alongthe
Floodplain
Rolling river
Rolling river
Rolling river
Rolling river
Rolling river
Dike Dike
Main channel
Floodplain Flood
Cross secti