文档介绍:浅析建筑工程预结算审核
摘要:工程造价的预结算审核是合理确定工程造价的必要程序及重要手段。通过对预、结算进行全面、系统的检查和复核,及时纠正所存在的错误和问题,使之更加合理地确定工程造价,达到有效地控制工程造价的目的,保证项目目标管理的实现。现就如何才能既快又好的做好工程造价的审核,特别是预结算的审核方法做一下分析介绍。
关键词:工程造价;预结算;审核
abstract: the engineering cost the settlement auditing is to reasonably determine the necessary procedure of project cost and the important means. through to the settlement of, comprehensive and systematic examination and review, timely correcting mistakes and problems existed, and make it more reasonably determine the construction cost, to achieve the effective control of engineering cost objective, to ensure the realization of the target management project. how can we is quick and good do engineering cost auditing, especially the settlement of the audit methods do some analysis is introduced.
keywords: engineering construction; settlement; audit
1 预结算审核的现状
建设工程的生产过程是一个周期长、数量大的生产消费过程,具有多次性计价的特点,施工图预算与结算均为此过程的重要组成部分。施工图预算应控制在已批准的设计概算2或修正概算5范围之内。对按预算承发包的工程,预算是确定工程造价签订建筑安装工程合同,实行建设单位和施工单位投资包干和办理工程结算,实行经济核算和考核工程成本的依据。工程竣工结算是指施工企业按照合同规定的内容全部完成所承包的工程,经验收质量合格,并符合合同要求之后,向发包单位进行的最终工程款结算。经审查的工程竣工结算是核定建设工程造价的依据,也是建设项目竣工验收后编制竣工决算和核定新增固定资产价值的依据。根据审核工程预结算的经验,工程预结算审前和审后的实际造价,一般较正常的6%~20%的差距,不正常的竟高达40%~60%。因此,建设、监理、咨询、审计和资产评估等有关单位十分重视竣工结算的审核工作。工程预结算审计是一项时间周期较长、影响因素多、工作量繁重的工作,因而也是工程造价中的重点和难点。其审核的方法有很多,审核的内容也很广泛,因此采用合理的审核方法不仅能达到事半功倍的效果,而且将直接关系到审查的质量和速度。
2 工程造价审核的内容
工程量的审核
工程量计算是审核预结算工作中最繁琐、最耗时的一个工作环节。作为预结算的