文档介绍:SÜDDEUTSCHLAND
Risk
Expenditure
Asset Management and Cost Saving
Maintenance Strategy based on
Risk-Informed Decision Making
.
CostTÜV Süddeutschland effective, Bau und Betrieb reliable, GmbH and safe through TÜV gAte and ROI®
1
‘‘Our‘‘ World is changing
SÜDDEUTSCHLAND
Costs must
be decreased ‘‘SOMEHOW“
Increasing RISK-INFORMED
responsibility
Adapted
availability needed
Increased flexibility
needed
Worldwide Knowledge Based
competition
...........
The ‘‘Others“ are
‘‘More or Less“ doing it
PRESCRIPTIVETÜV Süddeutschland Bau und Betrieb GmbH
2
Understanding of ‘‘RISK’’
SÜDDEUTSCHLAND
Risk = Probability of Failure (PoF) x Consequence of Failure (CoF)
What‘s really new?
• new, traceable assessment criteria
Integral Approach • risk assessment requires multi-disciplinary team
• all type of equipment considered under one hat
• more distinctive regarding the identification of
damage/deterioration mechanism to address
PoF optimized inspection techniques
• remnant life related (for predictable mechanism)
• confidence related
CoF • systematic introduction of CoF
SHE-related • distinction between SHE and Cost/Reliability CoF
Costs-related
TÜV Süddeutschland Bau und Betrieb GmbH
3
Related Guidelines and Documents
SÜDDEUTSCHLAND
• ASME Risk Based Inspection
Vol. 1 General Document
Vol. 3 Fossil Fuel Fired Electric Power Generating Systems
• EPRI Risk Based In-Service Inspection Evaluation Procedure
• WOG Application of Risk Based Methods for Piping In-Service Inspection
• API (American Petroleum Institute)
API 579 Fitness for Service
API RP 580 Risk Based Inspection (qualitative)
API RP 581 Risk Based Inspection (qualitative/quantitative)
Development of an European Guideline for Risk Based ISI/IST
and Maintenance:
Risk TÜVBased Süddeutschland In-Service Bau und Betrieb Inspection GmbH and Maintenance Procedures for European Industries
4
• Inspection Reports
• Oper