文档介绍:A公司生产线改善研究                                     Abstract: This article takes a production line of company A as the research object, records the production process in detail and analyzes the production process. It finds that the job site has the problems of uneconomical, unbalanced, stagnant and waiting. In response to the above problems, the relevant theories of industrial engineering were used to identify the bottleneck processes by plotting the production capacity balance charts, and the bottleneck processes were recorded and analyzed by using the two-hand motion analysis and the man-machine operation analysis; finally, 5W1H questioning techniques, ECRS principles, and action economy principles were applied to improve the existing problems. Key words: production line balance;production operations;industrial engineering;job improvement 中图分类号:F273 文献标识码:A 文章编号:1006-4311(2018)18-0170-03 1 生产线平衡常用方法概述 工作研究是工业工程体系中最重要的技术基础,工作研究的对象是作业系统。工作研究包括方法研究和作业测定两大技术,方法研究在于寻求更经济、更合理的作业方法,主要包括程序分析、作业分析、和动作分析。工作研究常用的分析技术是:5W1H提问技术、ECRS原则。人-机作业分析是通过以人为主工序作业的现场观察并详细记录,再加以分析,寻求合理的操作方法,平衡操作时间,使人和机器的配合更加协调,提高人机作业效率。双手作业分析图是以生产现场的某些作业一工序的操作过程为研究对象,采用标准流程图符号来记录其双手的动作,并可指导作业员如何有效得运用双手从事生产性的工作。 2 A公司生产作业现状分析 生产线现状 A公司是中国大陆商场展示架行业主要的制造商与出口商之一,本文研究的生产线位于A公司制造一厂,它有前道铁线加工车间和后道烤漆电镀车间。生产线为典型的工艺式布局,多品种,小订单式生产方式,产品不是流水线生产,而是由单工位或小型细胞线生产,各工作站之间的半成品是批量转移的。 改善前,