1 / 22
文档名称:

矿上开采项目施工管理办法.doc

格式:doc   大小:41KB   页数:22页
下载后只包含 1 个 DOC 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

矿上开采项目施工管理办法.doc

上传人:na2021 2021/9/14 文件大小:41 KB

下载得到文件列表

矿上开采项目施工管理办法.doc

文档介绍

文档介绍:several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
项目管理办法
一、目的
加强项目管理,理顺项目管理中人、财、物的关系,明确工作责任,充分体现人尽其才,物尽其用的原则,确保公司建设项目的施工现场管理符合公司现场管理工作标准以及国家有关施工现场的要求,努力完成与公司签订责任状上的任务,并尽可能超额完成。
二、项目部员工守则
1、遵守党和国家的法律、法规,遵守公司各项规章制度。
2、尊重当地民风民俗,不做有损当地居民感情和利益的事情。
3、严格遵守作息时间,不得迟到、早退、矿工,无条件服从组织安排,努力完成各项工作任务。
4、严格遵守日常考勤制度。项目部职工必须严格做到有事请假,并保证在不影响工作的情况下,经部、室、队负责人、项目经理同意后方可离开。副经理以上人员请事假必须经公司总经理同意,写请假条在公司办公室备案后,方可离开。否则一律作旷工处理,并追究责任。凡项目部或个职能部门召开的大小会议,通知后不得无故缺席,有事必须请假,无故缺席或中途早退者,每次扣100