文档介绍:Sondu/Miriu Hydropower Project
Sang' oro Power Plant
Contract. No.
SDM08
Employer
KENGEN
Engineer
Nippon Koui C(>..Lvd.
Contractor
Sinohydro Corporation Ltd.
Document No.
MD-06-B2-05-004 (RI)
P 修(s)
5
Date
16th Mar 2011
OPERATION AND MAINTENANCE MANUAL
OF GENERATOR
(Lot AP-2)
RI
16th Mar 2011
1st Submission
REV.
DATE
PREPARED
CHECKED
ENDORSED
APPROVED
Description
Format: A4
1 Operation of generator
Preparations before start-up, including:
Clean the work-yard and the generator set from any debris.
Check the tightening condition, lock the gasket tightly, tack weld if necessary; keep the rotatable parts clean.
Check the inlet and outlet water pipelines, oil pipelines and valves, in order to know if there arc leakages and problems of water flow in the pipe.
Check the lev』of lubricating oil, oil number, oil quality, water pressure, and record the water temperature and ambient temperature.
Check each connecting cable, to make sure that the joints contact well and without rust, connection is right, and the marks arc complete and distinct.
Check if the equipments of high-pressure oil and the brake run normally, and if the brake pressure can meet the relevant requirements.
Check the fire extinguishing system and other protecting facilities, to ensure security.
Check the gaps between rotating parts and station