1 / 27
文档名称:

Production and Operations Management Manufacturing and Services.ppt

格式:ppt   页数:27
下载后只包含 1 个 PPT 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

Production and Operations Management Manufacturing and Services.ppt

上传人:管理资源吧 2011/12/28 文件大小:0 KB

下载得到文件列表

Production and Operations Management Manufacturing and Services.ppt

文档介绍

文档介绍:Just-in-Time and Lean Systems
Operations Management
petitive Advantage
CHASE AQUILANO JACOBS
ninth edition
Chapter 10
Chapter 10 Just-in-Time and Lean Systems
JIT Defined
The Japanese Approach to Productivity
JIT Implementation Requirements
JIT in Services
Just-In-Time (JIT) Defined
JIT can be defined as an integrated set of activities designed to achieve high-volume production using minimal inventories (raw materials, work in process, and finished goods).
JIT also involves the elimination of waste in production effort.
JIT also involves the timing of production resources (., parts arrive at the next workstation “just in time”).
JIT Demand-Pull Logic
Exhibit
Customers
Sub
Sub
Fab
Fab
Fab
Fab
Vendor
Vendor
Vendor
Vendor
Final
Assembly
The Japanese Approach to Productivity
Imported technologies
Efforts concentrated on shop floor
Quality improvement focus
Elimination of waste
Respect for people
Waste in Operations
(1) Waste from overproduction
(2) Waste of waiting time
(3) Transportation waste
(4) Inventory waste
(5) Processing waste
(6) Waste of motion
(7) Waste from product defects
Minimizing Waste: Focused works
Final Assembly
Coordination
System Integration
Minimizing Waste: Group Technology (Part 1)
Using Departmental Specialization for plant layout can cause a lot of unnecessary material movement.
Saw
Saw
Lathe
Press
Press
Grinder
Lathe
Lathe
Saw
Press
Heat Treat
Grinder
Minimizing Waste: Group Technology (Part 2)
Revising by using Group Technology Cells can reduce movement and improve product flow.
Press
Lathe
Grinder
Grinder
A
2
B
Saw
Heat Treat
Lathe
Saw
Lathe
Press
Lathe
1
Minimizing Waste: Uniform Plant Loading
Not uniform Jan. Units Feb. Units Mar. Units Total
1,200 3,500 4,300 9,000
Uniform Jan. Units Feb. Units Mar. Units Total
3,000 3,000 3,000 9,000
Suppose we operate a production plant that produces a single product. The schedule of production for this product could be p

最近更新

2026湖南海利高新技术产业集团有限公司国家危.. 50页

2025广东广州医科大学药学院特聘教授向俊鸿课.. 47页

2025海南三亚中心医院(海南省第三人民医院).. 43页

2026年c语言初学者编程题目(综合卷) 13页

2026年C语言程序设计理论试题库及1套完整答案.. 13页

2026年云南省临沧地区单招职业倾向性测试模拟.. 45页

2026年信阳航空职业学院单招职业适应性测试题.. 44页

2024年长春职业技术大学辅导员考试笔试真题汇.. 30页

2026年制冷与空调作业人员考试题库带答案(培.. 40页

2026年南充职业技术学院单招职业适应性测试题.. 44页

2025年云南交通运输职业学院单招职业技能测试.. 44页

2025年芜湖职业技术大学马克思主义基本原理概.. 12页

2026年安徽省宣城市单招职业倾向性考试题库附.. 44页

2026年山西金融职业学院单招综合素质考试模拟.. 44页

2026南昌市昌南学校招聘派遣制初中体育教师1人.. 50页

2026年《红楼梦》知识竞赛试题库100道含答案【.. 39页

2026年会计专业技术资格考试题库200道及答案(.. 88页

2026年注册税务师考试题库含答案【研优卷】 47页

2026年哈密廉政考试题库及答案(各地真题) 14页

2026年自考专业(国贸)考试题库200道及完整答案.. 85页

2026年辽宁省锦州市单招职业倾向性考试题库附.. 44页

2026年工贸试题-考试题库附参考答案(研优卷).. 42页

2026辽宁沈阳市沈北汇置育邦实验学校小学招聘.. 52页

2026年最新西安摩托车考试历年真题精选答案 29页

2026年安徽城市管理职业学院单招职业适应性考.. 37页

2025年湖南省建设工程工程量清单计价办法(新).. 51页

2025年江西信息应用职业技术学院单招职业适应.. 127页

2025年江西信息应用职业技术学院单招职业倾向.. 73页

喝酒给老婆的检讨书 6页

vae乳液低温发泡工艺 29页