文档介绍:山西朔州平鲁区茂华东易煤业
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Pc valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
审 批
公 司 总经理 :
生产副总 :
生产技术部:
安 监 部 :
茂华东易 矿 长:
总工程师:
机电副矿长:
生产技术科:
计划经营科:
机 电 科:
编 制:
山西朔州平鲁区茂华东易煤业
several group number, then with b ± a, =c,c is is methyl b two verti