文档介绍:目 录一、工程概况······················ 21、工程简述············································22、实测实量操作流程····································2二、实测实量工作小组架构 ················ 31、组织管理体系 ·······································32、实测实量各组人员名单································33、项目管理人员职责 ···································4三、工程实测实量内容······································5、检查项目,原则及方法································5四、检查要求·············································35五、施工阶段全过程质量控制 ··································36六、施工质量预控措施·····································39一、:本工程位于宁波市-----------------,本工程共有----联体排屋组成;均为砼框架结构,总建筑面积约---- 万平方米。2、、、、、实测前准备:、组织学习《实测实量操作指引》掌握实测的方法规则。、项目部向各班组进行交底,实测实量的方法、规则及意义。、测量人员对项目进行查阅,带足项目资料,记录表、预测图纸;、检查丈量仪器有无差错,是否进行了检验;、实测,、实测时,把每层每户的混凝土结构工程、砌筑工程、抹灰工程、水电安装工程的偏差进行测量,、把测量数据,及时的纪录在准备好的测量表上,或表在图纸的相应位置上;记录要字迹清晰明了,、当一栋测量完成后,整理测量资料:计算各分项工程的合格率;、建立分户、分层实测档案,汇总成册。、改进、、从测量结果中分析薄弱环节;、制定改进方案;、落实改进方案到各班组;定期、定点、定项地进行单点改进。、改进后进行复查、总结。二、实测实量工作小组架构1、组织管理体系组 长:实测实量小组人员名单序号姓名拟在本工作组职责一、实测实量主要负责1包正辉现场项目负责人组长2技术员副组长3质检员组员4质检员组员5质检员组员6质检员组员3、项目管理人员职责组长,(现场项目负责人)1)、全面负责实测实量工作的管理,为实测实量工作第一负责人。)、策划,编制、落实《实测实量检查专项方案》。)、组建实测实量工作组,明确岗位职责并进行考核。)、对实测实量的人员、仪器进行合理安排,加强对实测实量工作的控制,定期召开实测实量工作组会议,保证实测实量工作的有序进行。5)、带领各组成员努力实现项目部对实测实量的目标。)、执行实测实量的相关标准、规范,定期进行记录检查,并采取纠正和预防措施,实施持续改进。副组长(技术员)岗位职责1)、协助组长,副组长建立健全实测实量管理的各项制度和措施,确保实测实量的顺利进行。2)、按照实测实量的主要职能分工,协调、配合。3)、参与《实测实量检查专项方案》的编制工作,落实本方案,确保实测实量工作目标的实现。4)、增强实测实量的检测力度,检查各项实测实量工作进行情况。5)、负责实测实量的管理工作,组织自查、自评。6)、协同组长开展各项工作,管理好实测实量成员。组员(质检员)岗位职责1)、认真细阅有关图纸,参加设计图纸交底,了解设计意图,掌握集团关于实测实量的技术规范、质量评定标准。2)、根据工程特点排列出重点关键部位质量监控点。3)、督促、实施质量技术措施,做好工程质量的检查和评定工作。4)、深入现场操作点,严格操作过程的质量监控,及时向作业人员反馈操作质量评定信息并做好记录。5)、对检验出的不合格的分项工程部位如实及时的填写。6)、负责对工程实际存在的或潜在的不合格因素进行调查分析。7)、依据实测实量控制措施,加强施工全过程的动态质量监控。8)、各阶段与实测实量小组成员一起做好实测实量的工作, 做好各项记录。9)、及时向上级报告各分部分项的实测实量结果, 确保实测实量资料的完整、准确。三、工程实测实量内容 :检查项目:(砼结构):截面尺寸偏差 [-5,8](1)以钢卷尺测量同一面墙/柱截面尺寸